Rainy Day And Forced Rescheduling
Coming up with a back up plan |
Rescheduling with interviewees |
That Friday, we went to our teacher and explained our situation. She told us we could either keep our original topic and get a few days' extension, or we could pick a new topic and stick with the original due date. After some consideration, my group decided it would be best for us to stick with the topic we had already, and take the extension. Once we let our teacher know, we quickly got to rescheduling all of our interviews aside from the one with Andrea, the head of technical theater at Inside Out Theatre Co., because her interview was scheduled for a day that was not effected by the flooding.
After sending a few messages, we were able to reschedule our interviews with the student heads of light and sound at our school as well as the day we film our b-roll for the Tuesday we got back from break. With everything planned, we were ready to proceed with the first interview with Andrea on the first Saturday of Thanksgiving break. Throughout the rest of the break Gabi, one of our group members, was able to get the interview with one of the actors from our drama class, I looked for archival footage we could use from past shows at Inside Out Theatre Co. and recorded the voiceover used at the beginning of the documentary, and Ace began to structure the what he could through editing.
No comments:
Post a Comment